Richard Broadwood – Brookfield Rail
A big thanks from Brookfield Rail for the effort and professionalism displayed on the recent Bonnie Vale MLK upgrade works.
Unfortunately the schedule work suffered a number of setbacks which extended the commissioning duration well beyond that planned this in turn extended the need for the Railtrain team to control trains and provide safe working.
The Railtrain team took pressure off the commissioning group by ensuring rail traffic continued with minimum disruption thus removing a major concern for the UGL / Brookfield team and allowing them to address the technical issues at hand knowing train movements and safe working was under control.